Music Inc Magazine December 2026

> Page 22 View from the Repair Bench > Page 23 NAMM YP

IN THE TRENCHES I BY CYPH SHAH WHAT 6 YEARS OF CITY INSTALLS TAUGHT ME

T he year 2026 has been quite a ride, and it closed out a journey for me that started in 2020. As the instal- lation foreman at Astro AVL in Glendale, California, I was respon- sible for executing systems in two multimillion-dollar city projects that, after years of back and forth, happened to have deadlines falling less than one month apart. We’re talking years of planning, nego- tiations, meetings, logistical chal- lenges and no shortage of hoops to jump through. So, now that I can breathe, it’s nice to take a moment to reflect on what I learned, how I overcame the hurdles and how this knowledge can benefit others. THE LONG GAME OF CITY PROJECTS During those six years I had a series of smaller projects taking place, usually several at a time. Defining scopes, deploying techni- cians, researching the right tools and methods to apply for the very specific requirements the situa- tion called for. Generally, projects can require anything from a few weeks to a few months. Working in the city ecosystem proved to be a much slower cycle. A lot can happen in six years. Project management firms get ter- minated only to be rehired years later. General contractors get fired

“Personally draft your contracts so nobody can engineer you out of your own scope.”

and replaced, leaving the new com- panies to play catch up on all the loose threads. A simple oversight by subcontractors can cause six figure mistakes, derailing a budget and causing an uncomfortable dis- cussion on who absorbs the fallout. Most of this stuff flew under the radar for the people on top be- cause it had to be resolved by the assortment of teams handling the logistics. And all of it adds up to

an unplanned investment of time and resources. Launch dates were pushed back from months to years as structural integrity plans had to be redesigned for new require- ments involving earthquake pre- paredness. Responsibility of scope of work can be deflected and reas- signed if contractors decide they’re not inclined to fulfill their original punch list. Mediations became a regular occurrence.

Several years in, I was almost decommissioned when an in- dividual tried to quietly replace my scope of work with another third party. My saving grace was my due diligence. Things are often ethereal in general phone conver- sations about how the future will go or what’s promised. But, when things get litigious, it always comes down to what’s in the contract. When drafting my submittal I had

20 I MUSIC INC. I DECEMBER 2026

Powered by